Measure with a clear boundary
Record dimensions, units and actual surfaces. Separate concrete, masonry and finishes into reviewable work packages.
Prepare building and renovation estimates with visible metric quantities, editable AUD examples and practical material purchasing assumptions.
Metric quantities · Editable rates · Purchase planning · Print-ready reports
EDITORIAL IMAGE · BUILDING IN AUSTRALIA10 m × 8 m × 0.15 m + 5%
Measured work, purchased material and installed cost are different parts of the same conversation.
Record dimensions, units and actual surfaces. Separate concrete, masonry and finishes into reviewable work packages.
Keep the product, quote date, unit and included services beside the price. Use your own supplier quotations.
See the effect of allowances, whole units and commercial packaging before discussing an order.
Three browser-local demos with metric quantities and editable AUD example rates. No account needed.
Adjust the dimensions, allowance and example rate. Review the formula behind the result.
This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.
A floor area is not a tile order. A concrete material subtotal is not the whole slab price. Give each figure a clear place in the estimate.
A practical sequence for measurement, rate review, purchasing and explanation.
Record dimensions, units, drawing revision and the scope being measured.
Keep specification, source, date and included services beside the price.
Review allowance, whole-unit rounding, delivery and handling.
Separate material subtotals, installed work and unresolved assumptions.
A metric example separates measured concrete, planning allowance and an AUD material subtotal.
Read the guideKeep floor area, finish boundaries, allowance and tile-box rounding separate.
Read the guideReview the commercial basis before turning an Australian supplier quote into a project estimate.
Read the guideChoose an individual workflow or greater capacity for a connected team.
A personal workspace for your estimating work.
A connected workflow for an estimating team.
More capacity for a larger operation.
Subscription prices are stated in USD on the main TB platform. Review current prices, working capacity, billing period, automatic renewal terms and the final checkout total before subscribing. AUD figures here are illustrative construction-material examples.
TB supports construction quantities, material purchase planning, editable cost estimates and resource scenarios. This edition introduces those workflows using metric dimensions, Australian terminology and illustrative AUD examples.
No. They are worked examples, not market averages or supplier offers. Use dated quotations for your project location, specification, order quantity and supply conditions.
Not automatically. Measure the actual surfaces in scope, identify exclusions and finish changes, then review the allowance and the selected product’s box coverage before rounding a purchase.
No. It calculates rectangular volume, a planning allowance and a concrete material subtotal. Reinforcement, formwork, labour, pumping, testing, equipment, delivery and tax require separate review.
Bring measured work, supplier rates and purchasing assumptions into a practical workflow. Explore TrendyBuilders and choose the capacity that suits your estimating work.